|
• Install hard interlock
between safety relay unit.
• Separate hard wiring among
distributed safety components.
• Separate monitoring wiring
is also required for PLC. |
• Provides network
connection with safety components, reducing wires and improves
productivity.
• Minimization of the
control panel size, as hard interlock is replaced by soft
interlock.
• Safety data and control
data can be managed on the same network by using DeviceNet.
• Design and modification
become easier with programmable safety control circuits. |